EUTECH INSTRUMENTS ALPHA COND 560 Manuel d'instructions Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 52
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
5
2.3 Connecting Peripherals
2.3.1 Connection Terminals
Remove Back Cover:
Remove the screws from the four corners at the back of the conductivity
controller. Remove the back cover. The connectors are exposed on the
back PCBA as shown in the Figure 1 below.
Connectors:
J11 – 24V DC power connector
J8 – 9V DC power connector (1.2mm diameter)
J9 – Relay connections
J10 - Conductivity electrode & Temperature probe connections (wiring
has to be done in the detachable connector
J10
J8
REL 1
REL 2
J9
9V DC Power
Screw
Figure 1: Outer Side of Back PCBA
J11 Connections
1. +ve
2. Gnd
J10 Connections
1. CON Low Current
2. CON Low Voltage
3. CON High Voltage
4. CON High Current
5. Pt 100 Compensate
6. Pt 100 Sense
7. Pt 100 GND
8. (No connection)
J9 Connections
Relay 1 & 2
1)+ve
2)Gnd
24V DC
J11
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 51 52

Commentaires sur ces manuels

Pas de commentaire